PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Poured L-5 Footing North-East (800x600).jpg Concrete Pump At Elev. 5-6 Facing South (800x600).jpg Monumental Stair Facing South-East (800x600).jpg Poured Monumental Stair Facing East (800x600).jpg Pouring concrete at Elev. 5-6 Facing South.jpg
Next page Poured L-5 Footing North-East (800x600)
Poured L-5 Footing North-East (800x600)